IMG_2176

First lorry load of SIPs ... at the bottom of the road

IMG_2175

And the other one...

IMG_2184

SIPs on site

IMG_2189

SIPs being put in place

LB9

Next batch ...

LB10a

Progress after first week (actually two days of SIP-ing)

LB10

Front

LB9a

Inside south

LB10b

Inside north

IMG_2296

Starting to be wrapped

IMG_2297

Joists

IMG_2298

East wing

IMG_2299

Waiting for the roof!